CASE STUDIES
WOOLACOMBE SCHOOL

To keep costs down we reused their existing control panel, replaced panel lights with new LED indicators, valiant controls for the two Variable temperature circuits using hardwired internal controllers, new relays, contactors, Mcb’s, surge protection and a Siemens PLC controller to operate the pumps giving them duty cycle rotation and a fail safe environment, external temperature compensation combined with gas modulation to improve performance and efficiency with consideration for frost protection.
DISTRICT HEATING NETWORKS

BLUEBELL CARE HOME

So to meet the installation deadline and heating requirements for the home we designed a bespoke system which incorporated two timer controllers for heating, hot water and a secondary return.
This was all controlled by a cascade system to improve performance and efficiency.
HIGH BULLEN GOLF CLUB SPA AND LEISURE CENTRE, DEVON

The existing hot water cylinders were in danger of creating serious flooding and the LPG boilers were in poor condition, We proposed replacement of their central plant room equipment.
We removed the existing boilers , cylinders, pumps ,heating and primary pipework in boiler house. Chemically flush system.
1) Install 2- 500L stainless steel indirect cylinders complete with temperature controls. (These units may be upgraded at a later date with the addition of an unvented kit to handle high pressure mains or boosted water supplies).
2) Install 2-Worcester Bosch 40CDI LPG boilers complete with new flues, distribution headers, controls and pumps for 2 heating circuits and 1 hot water circuit. (These 2 circuits supply the 2 existing circuits and in the future will supply new circuits) The boilers are large enough to do the entire court yard building which means that in the future the third separate boiler may be removed and system joined to the new plant.
3) Magna clean filters were fitted to protect the new boilers from the old system.
4) We installed Electronic Filling Device and new expansion vessel to meet WRAS regulations.
ANNUAL HEATING PLANT SERVICING AT HOLSWORTHY AND TAVISTOCK COLLEGES

All heating plant both gas and oil were serviced, plantroom checks done and where appropriate Commercial Gas Safety Certificates were issued. All gas pipework was safety tested and a tightness test certificate issued.

THE PARK SCHOOL

We installed new commercial heating boilers with new controls and control panel.
Optimum’s in-house electrical team ensured the project was installed, connected, commissioned quickly and efficiently.
We offer a one-stop shop, meaning you don’t have to employ third party control engineers for your electrical projects.
BURY BARTON

Solution: We calculated the total heat load for both existing families and future use and installed a KWB 60kw Multifire 1 boiler that can easily be converted between woodchip and pellet. Whether to use Pellet or Woodchip fuel was discussed with the client as this is a commercial installation. It was decided to proceed with Pellet for the following reasons:
COMMUNUAL HOUSING - TORRINGTON

The existing 16 year boiler was deemed beyond economical repair so within 48hours we had a 40kw direct replacement installed and commissioned.

NEW WORKSHOP ELECTRICAL INSTALLATION AT BRAY LEINO COMMUNICATIONS GROUP

STONEMAN ENGINEERING

ST GEORGES HOUSE

ACCREDITATIONS
Address
Optimum Heating & Electrical
Unit 11 Chivenor Business Park
Barnstaple, Devon. EX31 4AY