CASE STUDIES
WOOLACOMBE SCHOOL

To keep costs down we reused their existing control panel, replaced panel lights with new LED indicators, valiant controls for the two Variable temperature circuits using hardwired internal controllers, new relays, contactors, Mcb’s, surge protection and a Siemens PLC controller to operate the pumps giving them duty cycle rotation and a fail safe environment, external temperature compensation combined with gas modulation to improve performance and efficiency with consideration for frost protection.
BLUEBELL CARE HOME

So to meet the installation deadline and heating requirements for the home we designed a bespoke system which incorporated two timer controllers for heating, hot water and a secondary return.
This was all controlled by a cascade system to improve performance and efficiency.
THE PARK SCHOOL

We installed new commercial heating boilers with new controls and control panel.
Optimum’s in-house electrical team ensured the project was installed, connected, commissioned quickly and efficiently.
We offer a one-stop shop, meaning you don’t have to employ third party control engineers for your electrical projects.
ACCREDITATIONS
Address
Optimum Heating & Electrical
Unit 11 Chivenor Business Park
Barnstaple, Devon. EX31 4AY