CASE STUDIES

WOOLACOMBE SCHOOL

Optimum Electrical were asked to replace their existing plant room control system with a new simpler solution as they were also having their boilers replaced by Optimum Heating.

To keep costs down we reused their existing control panel, replaced panel lights with new LED indicators, valiant controls for the two Variable temperature circuits using hardwired internal controllers, new relays, contactors, Mcb’s, surge protection and a Siemens PLC controller to operate the pumps giving them duty cycle rotation and a fail safe environment, external temperature compensation combined with gas modulation to improve performance and efficiency with consideration for frost protection.

BLUEBELL CARE HOME

We were asked to provide a cascade system and duty cycle for the two new boilers Installed by Optimum Heating but as we were coming out of covid getting hold of controls was a challenge.

So to meet the installation deadline and heating requirements for the home we designed a bespoke system which incorporated two timer controllers for heating, hot water and a secondary return.

This was all controlled by a cascade system to improve performance and efficiency.

THE PARK SCHOOL

Optimum Electrical removed and updated the ageing heating and domestic hot water system in the Sports Hall plant room.

 We installed new commercial heating boilers with new controls and control panel.

Optimum’s in-house electrical team ensured the project was installed, connected, commissioned quickly and efficiently.

We offer a one-stop shop, meaning you don’t have to employ third party control engineers for your electrical projects.