Client: Stoneman Engineering, Willand, Devon
Project Scope: This engineering factory required space heating to workshop areas and offices.
Solution: Optimum designed a wet space heating system using warm air fan units for the customer to install using their own contractors. Optimum then installed a KWB Pelletfire 195kw pellet boiler, a 3000litre buffer vessel and a bespoke plywood 10 tonne double auger fuel store. Optimum commissioned all systems alongside the customers own contractors.
Cost of Project: £81,250