•This is a complete electrical fit out of a commercial workshop at Bray Leino.
•The first task was to install temporary site services to allow building works to commence (e.g. lighting and water).
•The electrical team then erected containment which included cable tray, galvanized trunking and conduit. The containment supports all of our cables and provides the mechanical protection that’s required within an industrial environment.
•The electrical team installed high bay and low bay light fittings.
•All the support system are constructed from galvanized metal to avoid premature collapse in the event of a fire.
•We also installed emergency lighting to aid escape in the event of a fire.