NEW WORKSHOP ELECTRICAL INSTALLATION AT BRAY LEINO COMMUNICATIONS GROUP

•This is a complete electrical fit out of a commercial workshop at Bray Leino.
•The first task was to install temporary site services to allow building works to commence (e.g. lighting and water).
•The electrical team then erected containment which included cable tray, galvanized trunking and conduit. The containment supports all of our cables and provides the mechanical protection that’s required within an industrial environment.
•The electrical team installed high bay and low bay light fittings.
•All the support system are constructed from galvanized metal to avoid premature collapse in the event of a fire.
•We also installed emergency lighting to aid escape in the event of a fire.

About Optimum

Why deal with Optimum Heating?

- We have a been trading for 30 years
- We have no County Court Judgements
- Creditors are paid on time and to terms agreed
- We have an excellent Health and Safety record

"Our main aim to be a strong credible customer orientated company with the ability to provide a happy and safe place to work for all of our staff" - Simon Boorer

Affiliates & Accreditations

Optimum Heating Ltd
Unit 11 Chivenor Business Park
Barnstaple, Devon. EX31 4AY

Website Design by WillcoxMedia © 2024. All rights reserved.

Call Now ButtonCall Optimum Heating